These piles can be driven to depth, maintaining a clean worksite, with high productivity.
Grout injection at the pile toe increases lateral capacity, and gives completed pile high
tension and lateral load capacity.
- Setting up on the pile position.
- Driving of pile by means of hydraulic or diesel hammer, with simultaneous
injection of grout.
- Soil is both supported and compacted by grout injection during driving.
- Completed pile.
- Cutting off of pile, and welding on a capping plate or starter bars.
Bawang Piles
Tube Piles can be constructed with enlarged bases (Bawang) for increased load bearing
capacity.
|
|